Three years ago, before any of this had a name, a two-person team I know spent a Tuesday driving ninety minutes in the wrong direction because of a spreadsheet column that said "priority" and meant nothing.
The shortlist had cleared screening the week before. Forty-one parcels, all north of a hundred acres, all outside flood zones, all far enough from the airport overlay to pass the first cut. Somebody had sorted them by acreage, largest first, because acreage was the column everyone trusted and nobody wanted to argue about. The two biggest parcels sat in the same county, on opposite ends of it, forty minutes apart from each other and ninety from the interconnection work that mattered that week.
They drove to the first one. Good bones on paper. Flat, clean, decent road frontage. Then they got there and found three miles of county road between the parcel and the nearest three-phase line, a gap that hadn't shown up in the acreage sort because acreage doesn't know what a line looks like. The second parcel, twelve miles smaller, sat four hundred feet off a substation with a spare bay. Nobody had looked at it yet because it was fourteenth on the list.
That's the part that sticks with people who've done this job a while: the list wasn't wrong, exactly. Every parcel on it had genuinely cleared screening. The order was wrong. And driving order is the thing that costs money, because a field day is a field day whether you spend it on parcel four or parcel twenty-eight.
I've heard versions of this story with different details more times than I can count. The county changes. The reason the sort went bad changes. Sometimes it's acreage, sometimes it's whoever submitted the parcel data first, sometimes it's just date-added. But the shape of the mistake repeats: a shortlist that's been screened for the disqualifiers gets ranked on the one number everyone has, instead of the handful of numbers that predict whether a visit is worth the gas.
Grid distance matters more than most sort columns admit. So does the quality of what sits between the parcel and the road, whether that's two miles of gravel or four hundred feet of pavement. Irradiance differences across a regional shortlist are usually small, but they're not zero, and they compound with everything else. None of that shows up in an acreage sort, or a date-added sort, or whatever the spreadsheet defaulted to because somebody clicked a column header in a hurry.
In the version of this story I trust most, the fix had nothing to do with screening the parcels again. They had already cleared screening once. The fix was treating the order itself as a deliverable, something built from a composite of the factors that predict a good visit, rather than inherited from whatever field happened to be sortable. That's the idea behind Solar Site Ranking: a ranked table built so the substation-adjacent fourteenth parcel lands somewhere near the top of the morning instead of somewhere after lunch.
The other thing that story taught the team involved, and that I'd pass on to anyone running a shortlist this season: revise the order as new information comes in. A parcel that ranks well in January can rank differently after a right-of-way complication surfaces in March, or after a neighboring project eats the interconnection capacity you were counting on. A ranking is a living order, built once and checked often. Skip the revisions and it starts lying to you a little, the same way that acreage sort did.
Finding out the hard way which county has the spare substation bay burns a field day you can't get back. If your shortlist has cleared screening and you're still sorting it by whatever column is handy, it's worth seeing what a proper driving order for your parcels looks like.